Maximo functional consultant interview topics

Here are some of the key topics that a Maximo Functional Consultant should study when preparing for interview as a functional consultant   What is Maximo? It's a software tool that helps businesses manage their assets, work orders, and inventory.  How does Maximo work? It uses a database to store information and allows users to track and manage different aspects of their operations. How to add and manage assets in Maximo (like equipment, buildings, and vehicles).  How to track asset information (like location, condition, and maintenance history).   How to plan and schedule maintenance for assets. How to create and manage work orders (tasks that need to be done).  How to assign work orders to technicians.   How to track the progress of work orders and ensure they are completed on time.  How to track inventory levels (how much of each item you have).  How to manage purchase orders (requests for items).   How to manage receiving and issuing of inventory. How to create reports to analy

Kit in maximo

A kit is list of consumable issued together. For example suppose a mechanic needs to change oil in rolls Royce car so he will ask storeroom manager to issue oil change kit. In oil kit he will get  Engine Oil Oil filter  Drain plug water Oil pan Grease gun Air filter etc.. They are issued together so mechanic don't hv to go again and again to the store manager.

Lot items

Some items hv lot type as checked in maximo what that means is they are produced or used in batches and they have expiry date. You can change an item from lot to no lot and vice versa only if hv not added to storeroom. By default an item is marked no lot

Maximo Application Suite Apppoints

Let's learn about APP Points today in Mas9 In simple terms Apppoints are like points you require to play a game. Similarly you require app points to use maximo. The more no of users and application or parts of maximo we want to use the more app points we require. If your environment is using more no of app point make sure session time out is properly configured to a optimum value. We gave access to user on maximo manage either in  concurrent way where multiple users simultaneously use system using same appoints which gets deducted after every hour usage or in a authorised way  using reserved Apppoints. Authorization for particular access will still be given in security group application.

Let's talk about Kpi

We hv 3 apps in maximo for kpi KPI template  KPI manager  KPI viewer KPI template is used to create multiple kpo using variables. When creating kpi template thing about what that variable will be replaced with when kpi is generated using generate KPI. Kpi manager is to create single kpi. Kpi viewer is used to view kpi for analysis.

Maximo Quiz question 1

How welcome to our quiz series  You have requirement to add a new asset in maximo which will be a 3 rd party asset need to return to the third party organization after 6 months how will you manage this asset Maximo Answers:- We can create a lease contract for this requirement and define lease period as 6 months in maximo We can create an escalation to remind us to return this asset to third party few days to go in lease end date.

Maximo workcenter

 They are special interface to allow user to enter data in form without using classic maximo screens. Following are few examples of workcenter  Sr, inspection,work approval and technician etc.